 |
|
 |  |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| © 2006, Estrella Engineering Inc. |
|
| Project Experience: Government
Agency Projects |
| |
|
- Modifications to the SSGN, Trident Training Facility
Kings Bay Naval Station, Georgia
Responsible for field investigations, HVAC engineering and controls
modifications for simulator equipment cooling and classroom cooling.
2004 / Mechanical Construction Cost: $ 200,000
- Building Addition at the Trident Submarine Base
Kings Bay Naval Station, Georgia
Responsible for engineering and submittal review For a new addition
and new HVAC system. 2004 / Mechanical Construction Cost: $ 25,000
- NADEP Parts Processing Facility
Naval Air Station, Jacksonville, Florida
Responsible for engineering and construction administration for
the addition of a new air-conditioned warehouse.
2004 / Mechanical, Plumbing AND Fire Protection Construction
Cost: $
80,000
- Eight Floor Renovation at the Base Hospital Building
NAS Jacksonville, Florida
Responsible for engineering modifications of the HVAC, plumbing,
and sprinkler systems serving patient rooms and nursing facilities.
2004
/ Mechanical Construction Cost: $ 150,000
- Ribault Bay Housing Revitalization
Naval Station Mayport, Florida
Responsible for field investigations, engineering, and construction
administration services provided for renovation of HVAC and plumbing
systems for 200 military town house homes.
2003 / Mechanical and
Plumbing Construction Cost: $ 1,000,000
- Remodel Building 448, Second Floor
Naval Station Mayport, Florida
Responsible for field investigations, engineering, and construction
administration services provided for additions and remodeling
of HVAC and plumbing systems to meet the user needs.
2001 / Mechanical and Plumbing
Construction Cost: $ 150,000
- AES Warehouse / Administration Office
Pope Air Force Base, N.C.
Responsible for field investigations, construction documents,
and construction administration services provided for a warehouse/office
expansion and a new 4,000 square foot administration building.
Engineered systems include HVAC, DDC controls, and plumbing.
2001 / Mechanical
and Plumbing Construction Cost: $ 78,000
- Administration Building
Dobbins Naval Air Station, Georgia
Responsible for engineering and construction administration services
provided for a 13,000 square foot office building. Engineered
systems included HVAC, controls and plumbing.
2001 / Mechanical and Plumbing
Construction Cost: $ 195,000
- NADEP Parts Processing Facility
Naval Air Station, Jacksonville, Florida
Responsible for engineering and construction administration for
the addition of a new air-conditioned warehouse.
2000 / Mechanical and Plumbing
Construction Cost: $ 50,000
- Jacksonville District Corps of Engineers
Renovation of Office Building
Military Traffic Management Command, Guaynabo, Puerto Rico
Engineering and construction administration services were provided
for the renovation of a 4,800 square foot office structure. Renovations
provide for additions and remodeling of the air conditioning systems
for addition of personnel and computers. Plumbing upgrades provided
for ADA improvements.
2000 / Mechanical and
Plumbing Construction Cost: $ 48,000
- Single Sailor Facility, Mayport Naval Station
Mayport, Florida
Responsible for engineering and conversion of an existing warehouse
facility to a recreation facility. New work provided a 77-ton
central chilled water system, new plumbing facilities for restrooms
and laundry, and modification of an existing sprinkler system
for new occupancy.
2000 / Mechanical, Plumbing, and Fire Protection Construction
Cost: $ 140,000
- Waste Transfer Facility, Mayport Naval Air Station
Mayport, Florida
Responsible for building HVAC and plumbing designs for processing
area, office, storage, and toilets. 1997 / Mechanical and Plumbing Construction
Cost: $40,000
- Fire Pump Generators
Naval Air Station, Jacksonville, Florida
Heating, ventilation, fire protection, and piping design to replace
and refurbish three fire pump installations.
1989 / Mechanical, Plumbing,
and Fire Protection Construction Cost: $90,000
- Nursing Home Care Unit - A/C Modifications
Veterans Administration Hospital, Gainesville, Florida
Investigations, analysis, construction documents, and construction
services to improve AC systems and comfort. Mechanical and electrical
engineering provided for alteration to central constant and variable
volume systems. 1989 / Mechanical and Plumbing Construction
Cost: $125,000
- Convert Inlet Vanes for Air Handling Units
Veterans Administration Hospital, Gainesville, Florida
Mechanical and electrical investigations, construction documents,
and construction services to convert inlet vane control to variable
frequency control on four major hospital VAV high-pressure air
handling units.
1989 / Construction Cost: $45,000
|
|